Transport and Infrastructure Minister Sorin Grindeanu told a news conference that with the signing of the contracts for the construction of lots 2 and 3 of the Buzau – Focsani section, there are nine out of a total of 13 lots of the Ploiesti-Pascani Highway that are funded through the National Resilience and Recovery Plan […]Spedition UMB constructor, one step away from working on entire Moldavia Highway
Transport and Infrastructure Minister Sorin Grindeanu told a news conference that with the signing of the contracts for the construction of lots 2 and 3 of the Buzau – Focsani section, there are nine out of a total of 13 lots of the Ploiesti-Pascani Highway that are funded through the National Resilience and Recovery Plan […]
Proiectul jurnalistic pressonline.ro este un proiect susținut de AGI
- o asociație neguvernamentală, apolitică și non-profit.
- o asociație neguvernamentală, apolitică și non-profit.
Depinde și de tine să susții o presă independentă.




